The first All Through School for the Perry Beeches Trust, the scheme (a Free School) was based on a two phase approach. Phase one was successfully handed over in September 2015 and phase two opened in late September 2016.

The Primary School element is based on a 4FE provision with the Secondary School providing an 8FE establishment.

The existing commercial building was refurbished to provide teaching initially for Reception, Year One and Year Seven, with the intention that the spaces can be easily relabelled to provide Primary School teaching in 2016.

Phase two includes 6,000msq of new build accommodates the Secondary School and some of the sports facilities.